Sending Gerber, BOM and Drawings to a Shenzhen Supplier: What Is Safe

Every first-time hardware builder hits the same moment of hesitation: a Shenzhen assembly house has asked for your design files, and your unfabricated product is about to travel, by email or upload, to a company you have never met. Here is what a quote actually requires, what it does not, and how experienced buyers sequence the exchange so a design is never exposed more than it needs to be.

File handling and quoting practice re-checked with local assembly houses: November 2026.

The three files a real quote needs

When an order gets serious, three files decide the quote:

  • Gerber files (RS-274X) — the board itself: copper layers, soldermask, silkscreen and drill data. The fabricator reads these to make the bare board.
  • BOM (bill of materials) — every component with manufacturer part numbers, quantities and reference designators. This is what the assembler quotes components from, and where vague lines ('10k resistor, any brand') turn into substitutions.
  • Pick-and-place / centroid file — the X/Y coordinate and rotation of every part, which drives the machine program for assembly.

Mechanical drawings matter for fit-critical parts — connectors, enclosures, displays — and should carry the dimensions the supplier must hold, not your full industrial design. Anything a part does not need to know, a drawing does not need to show.

A first quote usually needs none of them

The step most buyers skip: a first price often comes from layer count, board size and quantity alone, plus a rough part count for turnkey assembly. That is enough for planning and for narrowing a shortlist from, say, five houses to two. The full design only needs to move once a supplier is a finalist — which means the files you were nervous about sending have an audience of one or two, not five.

Four habits that keep a design safe

None of these cost money, and together they cover most of the realistic risk:

  • Send only what the quote requires. A price on a bare board does not need your schematic. A turnkey quote needs the BOM, but not your firmware. Ask what the house will actually read, and send that.
  • Keep a dated copy of everything you sent, and send from a company channel. A record of exactly which files left, when, and to whom is what makes any later dispute discussable. A company email address beats a personal chat ID for the same reason.
  • Ask for a written NDA when the design is genuinely novel. Assembly houses sign NDAs as part of ordinary business; the request itself is routine. What the paper mostly buys you is a supplier who has thought about confidentiality before receiving anything. A house that resists signing anything before you have paid them is telling you something useful.
  • Do not broadcast the complete package. Sending one full design to five suppliers for a price comparison is how files end up somewhere you did not intend — and, ironically, how you get worse prices, because nothing forces a supplier to sharpen a number that cost them nothing. Quote wide with parameters, send files narrow.

Payment and inspection: sequence the money like the files

The same logic applies to money that applies to files: stage it. Deposit and balance terms are normal in Shenzhen, and the protective version is simple — a sample or first article is tested before a deposit leaves, and the balance is released only after the finished boards are checked. For assembly orders, that check is the pre-shipment inspection: quantity against the packing list, functional tests on a sample, cosmetics against an agreed AQL level, photos and a written report before the balance moves. A supplier who insists on one hundred percent upfront, on a first order, before any sample has passed, is pricing your risk into their cash flow — and the answer is usually to find a second supplier rather than to accept the terms. If you cannot run the inspection yourself, a sourcing agent on the ground does it per visit and reports in writing.

Estimate before you send anything

You can plan the whole budget before a single file leaves your machine: our PCB assembly cost guide includes a calculator that runs entirely in your browser — you type layer count, size and quantity, it shows a planning range locally, and nothing is uploaded anywhere. Use it to sanity-check the quotes that come back, then start the sequence: parameters to a wide shortlist, files to one or two finalists, NDA before the design moves, inspection before the balance does.

Sending design files to China FAQ

Is it safe to send Gerber files to a Chinese supplier?

For the large majority of professional assembly houses, file handling is routine commercial confidentiality — they live on customer designs. The realistic risk concentrates in broadcasting one design widely for quotes and in suppliers without a track record. The protective sequence costs nothing: quote from parameters first, shortlist to one or two, ask for a written NDA when the design is novel, keep a dated record of what you sent, and stage payments against inspection.

Can I get a PCB assembly quote without sending my design files?

Yes — a first planning quote usually comes from layer count, board size, quantity and a rough part count alone. Suppliers quote from those parameters every day. Full files only become necessary once you have picked the house that will actually build, and the <a href="/pcb-assembly-china/">browser-based cost calculator</a> gives you a range before any conversation starts.

Will a Shenzhen supplier sign an NDA?

Assembly houses and factories sign NDAs as part of ordinary business, especially for novel designs; asking for one before files move is routine and widely understood. The paper matters less than the sequencing around it — a supplier asked to sign before receiving anything has already told you how they treat confidentiality.